Terms and construction

Which statements are terms

Not every statement made during negotiations becomes a term of the contract. A term is a promise that can be enforced through a contract claim. A representation is a statement that induces the contract but is instead dealt with through misrepresentation law or statutory bans on misleading conduct.

Courts ask an objective question: would a reasonable person think the parties intended the statement to be a promise? Relevant factors include how important the statement was, the relative expertise of the parties, whether the speaker invited the other side to check it, and how much time passed before the contract was made.

Terms written in a document can become part of the contract in three ways. First, by signature. Second, by reasonable notice given before or when the contract was made. Third, through a consistent course of dealing between the same parties over time.

Signing a document is usually binding, even if the signer never read it. However, this is not absolute. It does not apply where there was misrepresentation about what the document meant, or where the document would not reasonably seem to be a contract at all.

Notice of a term must be given before the contract is finalised. A term introduced afterwards, such as on a receipt or a sign seen only after entering a room, comes too late to count.

Construction

Courts work out what a contract means objectively. They ask what a reasonable businessperson would understand the words to mean. This is read as a whole, in context, not based on what one party secretly hoped for.

Courts read the whole contract, not just one clause in isolation. Where wording could mean more than one thing, courts generally prefer the meaning that makes commercial sense. Electricity Generation Corporation v Woodside Energy Ltd (2014) 251 CLR 640 is the leading case on this.

Surrounding circumstances can help interpret a contract. But Australian law is cautious here, and evidence of prior negotiations or subjective intentions is generally not allowed. The parol evidence rule stops outside evidence being used to add to, vary or contradict a fully written contract. This rule has significant exceptions, including collateral contracts, rectification and partly-oral agreements.

Contract terms are classified by what happens if they are breached. A condition is a term where breach lets the other party end the contract. A warranty is a term where breach only gives a right to damages. An intermediate term sits between these: the remedy depends on how serious the actual breach was. Working out which type a term is depends on construction, and the label parties use matters but is not decisive.

A Quick Read uses simpler language and may leave out detail, including whole topics, to stay short. The full article is the complete statement.

Read the full article →

Pop quiz

5 quick questions on this article, the authorities it cites and the articles it links to.

  • About 3 minutes, and no time limit.
  • You can only go forwards: each answer locks when you submit it.
  • After each question you see the right answer, why, and where to read more.
  • Free, and no account needed. Log in or create a free account to keep your scores.