Performance is the usual way a contract ends. A party must perform completely and exactly to discharge their obligations. But three exceptions soften this strict rule.

First, substantial performance. If a party has mostly performed, they can still claim the contract price. The claim is reduced by an allowance for the defects.

Second, divisible obligations. Sometimes a contract is really several separate obligations. Each one is discharged as it is performed, rather than waiting for the whole contract.

Third, prevention and acceptance. A party stopped from finishing their performance may still recover something. The same applies if the other side freely accepts partial performance. This recovery is restitutionary, meaning it compensates for the benefit given, not the full contract price.

Termination for breach

Not every breach lets the innocent party end the contract. Termination is only allowed in four situations.

First, the term broken is a condition, meaning an essential term. Second, the term is intermediate, and the breach is serious enough to deprive the innocent party of substantially the whole benefit of the contract. Third, there is repudiation. This means words or conduct showing unwillingness or inability to be bound, and it can happen even before performance is due. Fourth, an express termination clause applies, but only according to its own terms.

Once one of these applies, the innocent party must elect: terminate or affirm the contract. This choice requires knowledge of both the facts and the right to terminate. The election, once made, is final, and delay in choosing may count as affirmation.

Termination only operates going forward. Rights that already accrued before termination still survive.

Frustration

Frustration discharges a contract when, through no fault of either party, a later event makes performance impossible or radically different from what was agreed. The test is strict: extra cost, delay, or the deal becoming unprofitable is not enough.

The leading case is Codelfa Construction Pty Ltd v State Rail Authority of New South Wales (1982). There, an unforeseen injunction changed the agreed method of performing a construction contract so much that the contract was frustrated.

Frustration will not apply if the parties foresaw the event and planned for it, if a party caused it themselves (“self-induced frustration”), or if the contract already assigns that risk to one party.

Frustration works automatically. It ends the contract from the moment of the frustrating event, with no need for either party to choose this outcome.

The common law rules on repaying money or benefits after frustration are unsatisfactory. Some jurisdictions have passed frustrated contracts legislation to fix this, so check the relevant Act.

A Quick Read uses simpler language and may leave out detail, including whole topics, to stay short. The full article is the complete statement.

Read the full article →

Pop quiz

5 quick questions on this article, the authorities it cites and the articles it links to.

  • About 3 minutes, and no time limit.
  • You can only go forwards: each answer locks when you submit it.
  • After each question you see the right answer, why, and where to read more.
  • Free, and no account needed. Log in or create a free account to keep your scores.